New Taramakau Bridge work continues

SHARE

Work continues apace on the construction of the new $25 million Taramakau Bridge, with the contractor now full steam ahead driving the steel casings for the concrete piles being poured in the riverbed. In this view, two cranes stationed on the temporary bridge alongside the new bridge site, are used to lower a cylindrical cage […]

No posts to display