Tarmakau Bridge pile-up

SHARE

Gray Brothers Engineering at South Beach is busy making the massive pile casings for the concrete piers for the new two-lane Taramakau Bridge. Eddie Gray said 12 piles, each 23.8m long and 18 tonnes, were being pulled together then welded before being transported to the river site.